Checklist solar plant data PV

Checklist solar plant data PV

Please export this site to word first:

use the export to word option on the right to create a editable copy of this page:

image-20241021-151357.png

Contact for Global Support WhatsApp: +34611057760

1. General Information

Please make sure that there are now airspace restrictions

Guidelines for Checking Drone Flight Restrictions and controlled / restricted Airspace (CTA)

Baje la versión en Español aqui:

Baixe a versão em português aqui:

Plant data

Fill in referring data

Name

Plant's installed capacity in MWp

 

commissioning date

 

Location and outline of area to be inspected ideally in .kml /.kmz file (important if plant is not yet visible in google maps)

Any obstacles (towers, power lines, airport nearby...)

is there a no-fly zone? check it here: https://fly-safe.dji.com/nfz/nfz-query

 

Planned date of drone flight

 

Feed in Tariff (optional, used for financial loss estimates)

 

2. Drone Information

Drone data

Fill in referring data

Model and manufacturer

ONLY IF NOT USING VOLAFLY APP (not recommended):
Email address linked to your DJI flight hub account

3. Solar Plant - Technical Parameters

Technical Parameters

Data

Datasheet or photo of PV module nameplate

Technical drawing of the plant in PDF format (optional, can be used as an overlay to the analysis)

 

Type of system?

fix mount
1-axis tracked
2-axis tracked

Inclination of tables in case of fix mount systems (in [°])

 

Number of modules connected in a string

 

3.1 Technical Parameters - For Soiling Inspections

BELOW HERE IS ONLY RELEVANT FOR SOILING ANALYSIS:

Technical Parameters

Data

ONLY FOR SOILING: Is Solar Irradiance measured in the solar field? Preferably plane of array.

If no irradiance data is provided, constant conditions during flight are assumed that potentially lead to inaccuracies.

 

ONLY FOR SOILING: it is necessary to clean at least 4 modules of each module type in you solar field before the drone flights.
Please specify the exact locations of the modules you are going to clean. Either by coordinates (<5m accuracy) or an annotated screenshot of the plant layout

 

ONLY FOR SOILING: Dimensions of module length and width in [mm]
(if not specified in the documents above)

 

3.2 Technical Parameters - Detailed IEC 62446-3

BELOW HERE IS ONLY RELEVANT FOR IEC 62446-3 COMPLIANT INSPECTIONS:

Technical Parameters

Data

ONLY FOR IEC: Is plane-of-array (POA) irradiance measured in the solar field during the drone flight? A pyranometer or calibrated reference cell is required.

Without this data, IEC 62446-3 compliance cannot be confirmed.

 

ONLY FOR IEC: Is ambient temperature measured near the array during the drone flight? A calibrated sensor in shade is required.

 

ONLY FOR IEC: Is wind speed logged during the drone flight? Must remain below 5 m/s throughout the measurement.

 

ONLY FOR IEC: Please provide all sensor data as timestamped CSV or similar format, logged at minimum 1-minute intervals covering the full flight window. Upload alongside drone imagery to the Volateq analysis.

 

4. Users with Log-in

Users Name

E-Mail

TYPE - ADMIN / PILOT / VIWER