Seite aus diesem word erstellt https://volateqgmbh.sharepoint.com/:w:/r/sites/VolateqGmbH/_layouts/15/Doc.aspx?sourcedoc=%7B0EC5DC25-37B8-45EC-87BA-CA6022581212%7D&file=20220914_Checklist-solar_field_info_PV.docx&action=default&mobileredirect=true :
vor Beginn einer Messung als word exportieren und vom Kunden ausfüllen lassen.
bei selbst durchgeführter Messung wiki seite kopieren und in relevanten bereich verschieben
Plant data | Fill in referring data | Data delivered |
Name |
|
|
Location |
|
|
Address |
|
|
GPS Coordinates |
|
|
Altitude Above Sea Level |
|
|
Other Plant Data |
|
|
Type of internet connection, mobile data coverage (>3MBit for drone operation) |
|
|
Any obstacles (towers, power lines, airport nearby...) |
|
|
is there a no-fly zone? check it here: https://fly-safe.dji.com/nfz/nfz-query |
Please fill out the following or send PDF drawings (If possible “as built”):
All distance units in [mm].
Module | data | PDF delivered |
Type/Name/Datasheet |
|
|
Tracker type 1 | Fill in the referring data | PDF delivered |
Tracker or table Type/Datasheet |
|
|
Number of modules X (east-west) |
|
|
Number of modules Y (north-south) |
|
|
Gap between modules X (east-west) |
|
|
Gap between modules Y (north-south) |
|
|
Gap between modules at drive |
|
|
Tracker type 2 (if different types/sizes exist) | Fill in the referring data | PDF delivered |
Tracker or table Type/Datasheet |
|
|
Number of modules X (east-west) |
|
|
Number of modules Y (north-south) |
|
|
Gap between modules X (east-west) |
|
|
Gap between modules Y (north-south) |
|
|
Gap between modules at drive or pylon |
|
|
In order to integrate your own nomenclature in the results and visualizations, we need
plant´s name tag system for every component and solar field element:
Plant Coding System
| Data delivered |
Combiner |
|
String |
|
Tracker |
|
module |
|
how many modules are electrically connected in a string |
Sample Data Set of Solar Field Operation Time Series
This information needs to be delivered as csv files. The data needs to be provided and uploaded for each day where a measurement was carried out, because HTF temperature and operation status must be available prior to the evaluation. An initial solar field data session will be scheduled after the first kick-off meeting.
Sample data set for meteo and production | Data delivered |
POA irradiance | |
Wind speed (improves quality of data) |
|
Ambient temperature (improves quality of data) |
|
global horizontal irradiance (improves quality of data) |
|
Power production plant | |
Power per inverter - if available |
|
Add Comment